1. Please provide a total cost for work to repair the collapsed road on the area of wellingtonia
The total cost for work to repair the collapsed road on B3348 The Ridges, Finchampstead, is £785,016.32.

2. Please also include a summary of all costs including the costs of the road closures.
The cost for work to repair the collapsed road on B3348 The Ridges, Finchampstead, is broken down as follows:
Construction: £677,432.96, including £66,539.84 for traffic management
Geotechnical investigation, detailed design, and site support: £107,583.36

3. Please provide a summary of reports from residents over the proceeding 10 years relating to this stretch of road relating to the cracking and slippage of the road
Wokingham Borough Highways changed its Highways Term Maintenance provider on 1st April 2019, at which time the principal highways database was replaced. As a result, there is a difference in the information available before and after 1st April 2019, and separate tables are provided for the 2 periods.
A summary table of highway works carried out on B3348 The Ridges, Finchampstead, in the period 1st January 2012 to 31st March 2019 is available as an Excel File with this response. Please note that works not relating to road condition, e.g. removing fallen trees, cleaning signs, have been excluded.
A summary table of highway works carried out on B3348 The Ridges, Finchampstead, in the period 1st April 2019 to 8th December 2022 is available as an Excel File with this response. The table contains details of customer enquiries, highway defects and highways works orders.
No customer reports relating to B3348 The Ridges, Finchampstead, were received by the principal highways email address during the period 1st April 2019 to 12th March 2021 (the date of the emergency closure of The Ridges). Customer email reports from before 1st April 2019 were directed to obsolete email accounts and are no longer available.

4. Please provide a summary of highways inspections/condition. Reports for this road over the last 10 years
As explained above for question 3., separate tables are provided for the 2 periods before and after 1st April 2019.
A summary table of highway inspections carried out on B3348 The Ridges, Finchampstead, in the period 1st January 2012 to 31st March 2019 is available as an Excel File with this response.
A summary table of highway inspections carried out on B3348 The Ridges, Finchampstead, in the period 1st April 2019 to 8th December 2022 is available as an Excel File with this response.