Request ID
15635
Date Received
Date Resolved
Details

See notes

Resolution
See files
Notes
Date

1. Local Highway Authority name:

2. Does your Local Highway Authority use Low Temperature Asphalts (LTA) as part of your highways maintenance programme i.e. warm and half warm mix (Y/N)

3. What proportion of total Asphalt used for the last 3 years for reactive and planned highways maintenance do you estimate to be laid with a Low Temperature Asphalt
a) 2019/2020:
b) 2020/2021:
c) 2021/2022:

4. If easily available, Please provide an estimated total tonnage of asphalt laid for patching and resurfacing maintenance schemes for the last 3 financial years
a) 2019/2020:
b) 2020/2021:
c) 2021/2022:

5. If easily available, Please provide an estimated m2 of patching and resurfacing maintenance schemes delivered for the last 3 financial years
a) 2019/2020:
b) 2020/2021:
c) 2021/2022:

6. If easily available, Please provide an estimated number of potholes repaired in the last 3 financial years
a) 2019/2020:
b) 2020/2021:
c) 2021/2022:

7. What do you think the blockers are to delivering 100% of your highway maintenance programme with Low Temperature Asphalts - please check any that apply or provide free text if other blockers perceived
• Procurement (i.e. contract spec's)
• Availability of supply
• Design Standards
• Effect on pavement life
• Quality
• Workability of material
• Awareness of these materials
• Other - please provide details

Give website feedback