[Skip to content]

Advertising

Community Infrastructure Levy consultations / examination

Community Infrastructure Levy consultations and examination

Consultation on Preliminary Draft Charging Schedule

Consultation on Preliminary Draft Charging Schedule for Community Infrastructure Levy ran from 4 April to 16 May 2013.

The responses were analysed and used to inform the Draft Charging Schedule.

The Statement of Consultation (PDF document) summarises responses received.

All other relevant documents can be seen in the document library at the bottom of this page.

Consultation on the Draft Charging Schedule

Consultation on the Draft Charging Schedule for Community Infrastructure Levy ran from 29 January 2014 to 14 March 2014. 

Copies of the relevant documents can be seen in the document library at the bottom of this page.

Examination

On 12 June 2014 we submitted our  Draft Charging Schedule (PDF document) to the Secretary of State for Examination in Public. 

Public hearings were held on 18 / 19 September 2014. 

On 29 October 2014 we received the Community Infrastructure Levy Final Examiner's Report (PDF document). The view of the Examiner, Mr Philip Staddon, was that the Charging Schedule is sound, subject to some minor modifications.

We then adopted our Community Infrastructure Levy Charging Schedule on 6 April 2015.

Consultation on clarification of the CIL Regulation 123 List

Consultation on clarifications to the Council’s adopted Regulation 123 List of Infrastructure ran from 1 September to 13 October 2016.

The responses were analysed and used to inform the Council’s updated Regulation 123 List which was adopted at a meeting of the Executive on 26 January 2017.

You can download:


Copies of the relevant documents can be seen in the document library below.

Community Infrastructure Levy documents

 TitleCreatedDownload
application/pdfED.1.1 - Community Infrastructure Levy Final Draft Charging Schedule (1.95MB)10/06/2014Download
application/pdfED.1.2 CIL Charging Schedule Statement of Compliance (123KB)12/06/2014Download
application/pdfED.1.3 Reg 19 Statement of Representations (254KB)12/06/2014Download
application/pdfED.1.4a CIL DCS Reps 1-26 (5.40MB)10/06/2014Download
application/pdfED.1.4b SDL Consortia WBC CIL DCS Final Representation (5.32MB)10/06/2014Download
application/pdfED.1.5 DCS Executive Report Jan 14 (1.49MB)10/06/2014Download
application/pdfED.1.6 DCS Executive Minutes Jan 14 (15KB)10/06/2014Download
application/pdfED.1.7 Community Infrastructure Levy Draft Regulation 123 List (72KB)10/06/2014Download
application/pdfED.1.8 Community Infrastructure Levy Draft Instalment Policy (59KB)10/06/2014Download
application/pdfED.1.9 Draft CIL Examination Document Library (362KB)12/06/2014Download
application/pdfED.2.1 Community Infrastructure Levy Preliminary Draft Charging Schedule Executive Report (143KB)10/06/2014Download
application/pdfED.2.2 PDCS Executive Report Mar 13 (748KB)10/06/2014Download
application/pdfED.2.3 PDCS Executive Minutes Mar 13 (75KB)10/06/2014Download
application/pdfED.2.4 Community Infrastructure Levy Preliminary Draft Charging Schedule Statement of Consultation (263KB)10/06/2014Download
application/pdfED.3.1 Community Infrastructure Levy Viability Update Report (236KB)10/06/2014Download
application/pdfED.3.2 Community Infrastructure Levy Viability Report (961KB)10/06/2014Download
application/pdfED.3.3 Update to Affordable Housing Viability Study (187KB)10/06/2014Download
application/pdfED.3.4a Affordable Housing Viability Study (258KB)10/06/2014Download
application/pdfED.3.4b Affordable Housing Viability Appendices (136KB)10/06/2014Download
application/pdfED.3.5 Strategic Development Locations Economic Viability Study (242KB)10/06/2014Download
application/pdfED.4.1 Community Infrastructure Levy Infrastructure Planning and Funding Gap Assessment (182KB)10/06/2014Download
application/pdfED.4.2 Infrastructure Delivery SPD Oct 2011 (598KB)10/06/2014Download
Was this page useful?
Back to top